Brickell City Centre – Power Systems Analysis
Located in the center of downtown Miami’s financial district, this $1.05 billion shopping and mixed-use development spans four full city blocks. Emerald worked directly with the electrical equipment manufacturer, electrical contractor, utility provider and project engineers to perform an arc flash analysis, protective device coordination study, and short-circuit analysis for the entire development. All analyses were performed using SKM PowerTools software.
Project Details
PROJECT LOCATION
Miami, FL
PROJECT COMPLETION
2016
PROJECT TYPE
Power Systems Analysis