Miami Beach Convention Center – Power Systems Analysis

The $600 million renovation and expansion of the Miami Beach Convention Center includes a full replacement and upgrade of the campus electrical distribution.  Emerald worked directly with the electrical equipment manufacturer, electrical contractor, utility provider and project engineer to perform an arc flash analysis, protective device coordination study, and short-circuit analysis for the entire development.  All analyses were performed using SKM PowerTools software.

Project Details

PROJECT LOCATION

Miami, FL

PROJECT COMPLETION

2016-2018

PROJECT TYPE

Power Systems Analysis

Project Gallery