Miami Beach Convention Center – Power Systems Analysis
The $600 million renovation and expansion of the Miami Beach Convention Center includes a complete replacement and upgrade of the campus electrical distribution. Emerald collaborated directly with the electrical equipment manufacturer, electrical contractor, utility provider, and project engineer to conduct an arc flash analysis, protective device coordination study, and short-circuit analysis for the entire development. All analyses were performed using SKM PowerTools software.
Project Details
PROJECT LOCATION
Miami, FL
PROJECT COMPLETION
2016-2018
PROJECT TYPE
Power Systems Analysis