Miami Worldcenter Paramount Tower – Power Systems Analysis

Part of a $2+ billion mixed-use development, this 60-story luxury residential tower stands over 700 feet in height.  Emerald worked directly with the electrical equipment manufacturer, electrical contractor, utility provider and project engineer to perform an arc flash analysis, protective device coordination study, and short-circuit analysis for the entire development.  All analyses were performed using SKM PowerTools software.

Project Details

PROJECT LOCATION

Miami, FL

PROJECT COMPLETION

2019

PROJECT TYPE

Power Systems Analysis

Project Gallery